Allplan BIM 2008
Successful with Allplan: E.ON Energy redesigned, Munich/D (Adam Architekten/Florian Schreiber)

Change to the Allplan Method of Working

Does one of the following statements apply to You?

  • Your costs for drawing alterations are high
  • You need a lot of time to create quantity take-offs
  • You tend to avoid visualization as a general rule
  • Your floor space calculations are prone to error and often need updating

Overcome these challenges now with the Allplan Method of Working!

Creating detailed drawings and schedules quickly and effectively is one of your daily office tasks. Do you still work on your monitor as if it were your drawing board? If so, there are many additional advantages to be gained from the Allplan Method of Working using your „digital drawing board" without a great deal of additional effort and know-how.

Try the intelligent method of working used in Allplan Architecture.

Click on the following links to see how simple it is to produce high-quality results and satisfy the requirements of your clients using Allplan:

Allplan BIM 2008

Your next step

Testimonials

  • “However, the greatest benefit to me comes from the new building structure and the storey manager, which allows a simple entry into the world of BIM (Building Information Modeling)”
    (Markus Tretheway,
    CDS Engineer AG, Heerbrugg, Switzerland)